Resources
Public Environment Report
The Project (EPBC 2023/09643) was determined a controlled actionunder the Environment Protection and Biodiversity Conservation Act 1999 (the Act), with assessment by Public Environment Report.
The controlling provisions are:
- Sections 18 and 18A: Listed threatened species and communities
- Sections 20 and 20A: Listed migratory species
Tarong West Wind Farm PER
|
Part A: Public Environment Report |
|
|
|
|
|
|
A2 Public Environment Report Figures_part 1 of 5 A2 Public Environment Report Figures_part 2 of 5 A2 Public Environment Report Figures_part 3 of 5 |
|
Part B: Appendices |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Appendix T Targeted Matters of National Environmental Significance species surveys |
|
Part C: Referral Documentation |
|
|
|
|
Development Application Documents
- Planning Assessment Report
- Operational Works Plan
- Construction Management Plan
- Conceptual Erosion and Sediment Control Plan
- Aviation Impact Assessment Report
- Electromagnetic Impact Assessment Report
- Ecological Assessment Report
- Preliminary Fauna Management Plan
- Preliminary Vegetation Management Plan
- Preliminary Bird and Bat Management Plan
- Traffic Management Plan
- Traffic Impact Assessment Report
- Transport Route Study
- Preliminary Stormwater Management Plan
- Flood Assessment Report
- Landscape and Visual Impact Assessment Report
- Noise Impact Assessment Report
- Background Noise Monitoring Report
- Economic Impact Assessment
- State Development Assessment Provisions Code Assessment